LOT 1 Construction of Ferizaji 2 Substation 400/110kV and Associated Transmission System Works Installation Works

Investor/End user: KOSTT (Transmission system and market operator)

Year of completion: 2010-2011

Building of 400kV switchyard with double busbar system :

  • Two 400kV bays
  • One 400kV busbar measuring bay
  • One 400kV coupling bay
  • One Transformer Bay

Building of 110kV switchyard with double busbar system :

  • Five 110kV bays
  • One 110kV busbar measuring bay
  • One 110kV coupling bay
  • One 110kV Transformer Bay

Installation of power Transformer 400/115/10.5kV,300/300/1MVA

  • Assistance during installation and commissioning
  • Primary and secondary connections
  • Cabling and earthing connection

Implementation of installation works in secondary side:

  • Control and protection: installation of panels, cabling, assistance during commissioning
  • AC&DC implementation works: installation of panels, cabling, assistance during commissioning
  • Electrical installation of control building and relay houses: lighting, sockets, fire alarm
  • Outdoor lighting

Others:

  • Realization of earthing system, lightning protection and measurement
  • False floor control building and for relay house

PROJECT Ref.: Improvement of Transmission Network- Sector Programme IV and V – LOT 1 PO9503830981- Extension of SS Ferizaji 2 with two new feeders 400 kV and 110kV for Transformer 2 400/110kV

Investor/End user: KOSTT (Transmission system and market operator)

Year of completion: 2016-2017

 

Building of one 400kV Transformer bay:

  • Erection of steel structure
  • Erection of 400kV primary equipment
  • Commissioning of 400kV primary equipment
  • Extension of 400kV double busbar
  • Primary connections

Building of one 400kV Transformer bay:

  • Erection of steel structure
  • Erection of 110kV primary equipment
  • Commissioning of 110kV primary equipment
  • Primary connections

Works in installation of power Transformer 400/115/10.5kV,300/300/1MVA

  • Primary and secondary connections
  • Cabling and earthing connection

Implementation of installation works in secondary side:

  • Control and protection: installation of panels, cabling, assistance during commissioning

Civil works:

  • Design for civil works: foundations, cable channels
  • Building of foundations for primary equipment for new feeders
  • Extension of cable channels
  • Realization of earthing system for new feeders, lightning protection and measurement.