Project: Realization of electrical works for new HPP 13.2 MVA Lepenci 3

Investor/End user: “Hidroenergji” LLC

Year of completion: 2018

Installation and connection of block transformers.
Installation of Auxiliaries:

  • Installation and connection Auxiliary Transformer
  • Installation and connection AC distribution cubicle
  • Installation and connection DC systems: Batteries, rectifier and DC distribution cubicle, connection putting into operation
  • Installation and connection Diesel generator
  • Installation 35kV switchgears
    Installation compensation cubicle
  • Installations, connection control and protection cubicles for Generators 1,2 and 3
  • Supply and installation of cable tray system
  • Realization of Earthing system: connection of all cubicles, Transformers and all metallic part with earthing system
  • Laying and connection of power, control, signalization cables and others
  • Laying of MV cables, installation of termination, insulation testing