Project: Realization of electrical works for new HPP 13.2 MVA Lepenci 3
Investor/End user: “Hidroenergji” LLC
Year of completion: 2018
Installation and connection of block transformers.
Installation of Auxiliaries:
- Installation and connection Auxiliary Transformer
- Installation and connection AC distribution cubicle
- Installation and connection DC systems: Batteries, rectifier and DC distribution cubicle, connection putting into operation
- Installation and connection Diesel generator
- Installation 35kV switchgears
Installation compensation cubicle - Installations, connection control and protection cubicles for Generators 1,2 and 3
- Supply and installation of cable tray system
- Realization of Earthing system: connection of all cubicles, Transformers and all metallic part with earthing system
- Laying and connection of power, control, signalization cables and others
- Laying of MV cables, installation of termination, insulation testing