Ref.No.KCBC 06136-07-029-111/Rehabilitation of Substation 220/110kV Kosova A
Investor/End user: KOSTT (Transmission system and market operator)
Year of completion: 2008-2010
Building of 220kV switchyard with double busbar system :
- Two 220kV OHL bays
- Four 220kV Transformer bay
- Three 220kV Generator feeders
- One 220kV busbar measuring and coupling bay
Building of 110kV switchyard with double busbar system :
- Nine 110kV OHL bays
- Six 110kV Transformer bays
- One 110kV Generator Bay
- One 220kV busbar measuring and coupling bay
Implementation of installation works in secondary side:
- Control and protection: installation of panels, cabling, assistance during commissioning
- AC&DC implementation works: installation of panels, cabling, commissioning of complete AC&DC systems
- Electrical installation of control building: lighting, sockets, fire alarm.
- Outdoor lighting
Others:
- Realization of earthing system, lightning protection, measurement step & contact voltage and earthing resistance
- False floor control building